Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
4. VS engines
5. All engines
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
10.1. Specifications
10.2. General information
10.3. Epiploons replacement
10.4. Manual transmission removal and installation
10.5. 5 step check points of the FS5W71B/C types dismantling
10.6. 4-staged check points of the F4W71B and S types - dismantling
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 





10-6-4-stupenchatye-kpp-tipov-f4w71b-i-s-razborka.html

10.6. 4-staged check points of the F4W71B and S types - dismantling

1. Honor an order of dismantling and assembly of 4-staged check points same, as for 5-staged and differs in performance of the following operations.
2. Instead of operations on dismantling in items 17-34 (see section 4) execute the following.
1). Check a condition of gear wheels and shaft of the check point, existence on them of cracks and other damages
2). Check a face gap of gear wheels and compare to standard.
3). If damages are observed and the side play exceeds norm, then completely sort the check point and replace worn-out details
4). Press a stripper the forward bearing of an intermediate shaft.
5). Get a lock ring.
Б). Carefully get intermediate and primary shaft.
7). Remove a lock ring and a persistent washer from a main shaft.
8). Remove the synchronizer 3rd and 4th of transfers and a gear wheel of the 3rd transfer.
9). Release a nut of a secondary shaft.
10). Remove a lock ring and a gear wheel of a backing.
11). Carefully beat out secondary and intermediate shaft from transitional section.
3. Instead of operations on assembly in pct 78-91 (see section 4) execute the following.
1). From the back party of a secondary shaft establish a backing gear wheel, a washer and tighten by hand a nut.
2). Dress the leading gear wheel of a backing on an intermediate shaft and pick up a back lock ring for thickness to minimize an axial side play.
3). Install an intermediate gear wheel of a backing on the intermediate roller
4). Tighten a nut of a secondary shaft with the set moment.
5). Raskernite a nut wreath so that the wreath came into selection of a secondary shaft.
6). Again check a face gap of gear wheels.

"previous page
10.5. 5 step check points of the FS5W71B/C types dismantling
following page"
11. Automatic transmissions