Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
4. VS engines
5. All engines
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
13.1. Specifications
13.2. General information
13.3. The nave automatic interlock device - removal and installation
13.4. Half shafts - removal and installation
13.5. A half shaft - dismantling and assembly
13.6. A nave and a rotary fist - smyaty and installation
13.7. Nave epiploons – removal and installation, adjustment of bearings
13.8. The forward driveshaft - removal and installation
13.9. Epiploons of a forward reducer - replacement
13:10. A forward reducer - removal and installation
13:11. Epiploons of the transfer case - replacement
13:12. The transfer case - removal and installation
13:13. The transfer case - dismantling
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 






9ac83ee2

13-3-ustrojjstvo-samoblokirovki-stupicy-snyatie-i-ustanovka.html

13.3. The nave automatic interlock device - removal and installation

1. Remove a wheel
2. Turn off 6 bolts
3. Carefully remove the nave case, a ring, a spring and a lead And (the blocking ring, a photo).
4. Remove a lock ring, washers and a lead In (photo).
5. Check thickness of the blocking rings And yes In (photo). If thickness is less than norm, then replace both rings.
6. Assembly is carried out upside-down. Grease the specified details.

"previous page
13.2. General information
following page"
13.4. Half shafts - removal and installation