Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
3.1. General information
3.2. Types of the repair work performed without dismantle of the engine from the car
3.3. Order of installation of the piston of the 1st cylinder in compression step VMT.
3.4. A cover of a head of cylinders - removal and installation
3.5. The roller with yokes - removal and installation
3.6. The roller with yokes - dismantling and assembly
3.7. A cam-shaft - removal and installation
3.8. A cam-shaft, support and yokes - check
3.9. Springs of valves and oil scraper caps - replacement
3.10. The soaking-up collector - removal and installation
3.11. A final collector - removal and installation
3.12. A head of cylinders - removal
3.13. A head of cylinders - installation
3.14. The oil pump - removal and installation
3.15. The oil pump - check
3.16. A crankshaft pulley - removal and installation
3.17. A forward epiploon of the crankshaft - replacement
3.18. A forward cover - removal and installation
3.19. A chain and asterisks - removal and installation
3.20. The oil pallet - removal and installation
3.21. A flywheel (a drive plate of the hydrotransformer) - removal and installation
3.22. A back epiploon - replacement
3.23. Engine support - replacement
4. VS engines
5. All engines
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 






9ac83ee2

3-12-golovka-cilindrov-snyatie.html

3.12. A head of cylinders - removal

1. Merge cooling liquid.
2. Remove the air filter.
3. Remove the pump of the hydraulic booster and a roller of a natyazhitel of a belt of the pump (if are provided).
4. Disconnect from candles of a wire and take aside together with arms.
5. Disconnect an air ejection tube, remove the valve case (if it is provided).
6. Remove the soaking-up collector.
7. Remove the thermal vacuum distributor with an arm from a partition of a motor compartment.
8. Disconnect a recirculation tube.
9. Remove the fuel pump (mechanical).
10. Remove a final collector.
11. Uncover a head of cylinders.
12. Install the piston of the 1st cylinder in VMT of a step of compression and remove a cam-shaft asterisk (see above).
13. Release 10 bolts of a head of cylinders, turning off each bolt on 1/4 turn at one time. Release bolts in the specified sequence (photo). Turn out bolts and you store in cash desk in that order in which they were wrapped.
14. Turn off two small bolts of fastening of a forward cover.
15. Displace a head, easy blows through a wooden pro-rate and remove.
16. Remove laying.
17. The technique of check of a head is described in Part C.

"previous page
3.11. A final collector - removal and installation
following page"
3.13. A head of cylinders - installation