Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
3.1. General information
3.2. Types of the repair work performed without dismantle of the engine from the car
3.3. Order of installation of the piston of the 1st cylinder in compression step VMT.
3.4. A cover of a head of cylinders - removal and installation
3.5. The roller with yokes - removal and installation
3.6. The roller with yokes - dismantling and assembly
3.7. A cam-shaft - removal and installation
3.8. A cam-shaft, support and yokes - check
3.9. Springs of valves and oil scraper caps - replacement
3.10. The soaking-up collector - removal and installation
3.11. A final collector - removal and installation
3.12. A head of cylinders - removal
3.13. A head of cylinders - installation
3.14. The oil pump - removal and installation
3.15. The oil pump - check
3.16. A crankshaft pulley - removal and installation
3.17. A forward epiploon of the crankshaft - replacement
3.18. A forward cover - removal and installation
3.19. A chain and asterisks - removal and installation
3.20. The oil pallet - removal and installation
3.21. A flywheel (a drive plate of the hydrotransformer) - removal and installation
3.22. A back epiploon - replacement
3.23. Engine support - replacement
4. VS engines
5. All engines
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 






9ac83ee2

3-13-golovka-cilindrov-ustanovka.html

3.13. A head of cylinders - installation

1. Before installation carefully clear demountable surfaces of a head and the block of cylinders. Scrape off a deposit and the remains of material of laying, wash out solvent.
2. Check existence on the demountable planes of a head and the block of cylinders of zadir, chips, hollows and other damages.  Insignificant   damages   can be eliminated with a file, in the presence of serious damages the head or the block are subject to regrinding.
3. Accurately banish carvings of bolts and in openings under bolts.
4. Put new laying on the block of cylinders, focusing on pins. Carefully put a head on the block of cylinders, without violating the provision of laying.
5. Wrap by hand bolts of a head of cylinders on former places.
6. Tighten bolts with the set moment in the specified sequence (photo), doing 1/4 turns at one time. The order of an inhaling is specified in Specifications.
7. Establish a cam-shaft asterisk.
8. Other operations on assembly are carried out upside-down.
9. After completion of works fill the cooling system with liquid, start the engine, check existence of a leak. Check idling turns, if necessary adjust.

13.6 Последовательность затяжки болтов  головки  цилиндров (К24)
13.6 Sequence of an inhaling of bolts of a head of cylinders (K24)


10. Adjust valves, having established gaps for the heated-up engine.

"previous page
3.12. A head of cylinders - removal
following page"
3.14. The oil pump - removal and installation