Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
4. VS engines
4.1. General information
4.2. Types of the repair work performed without dismantle of the engine from the car
4.3. Order of installation of the piston of the 1st cylinder in compression step VMT.
4.4. Covers of heads of cylinders – removed and installation
4.5. The roller with yokes - removal and installation
4.6. Hydropushers - removal and installation
4.7. The soaking-up collector - removal and installation
4.8. A final collector - removal and installation
4.9. A pulley - an uspokoitel - removal and
4.10. A gear belt - removal and installation
4.11. A forward epiploon of the crankshaft - replacement
4.12. A cam-shaft epiploon - replacement
4.13. Heads of cylinders - removal and installation
4.14. A cam-shaft - removal and installation
4.15. Details of the valvate mechanism - check
4.16. The oil pallet - removal and installation
4.17. The oil pump - removal, check and installation
4.18. A back epiploon - replacement
4.19. A flywheel (a drive plate of the hydrotransformer) -
4.20. Engine support - replacement
5. All engines
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 





4-6-gidrotolkateli-snyatie-i-ustanovka.html

4.6. Hydropushers - removal and installation

1. Uncover a head of cylinders.
2. Record hydropushers rubber rings from drop-out (photo).
3. Remove the case with hydropushers (photo).
4. Get pushers and you store in an order of their installation.
5. Check the pusher course, having pressured him (photo). If the course exceeds 1 mm, then in a hydropusher air got.
6. If the course exceeds norm, then establish all details removed gas distribution and start the engine.
7. Bring turns to 1000 rpm, in 10 min. stop the engine.
8. Remove the case with pushers and again check the course. If at a pusher there is still an air, then replace pushers.
9. Check a condition of pushers (see below).
10. Installation is carried out upside-down.

6.5 Для проверки хода гидротолкателя надавите на него в направлении указанном стрелкой1.  Гидротолкатель
6.5 For check of the course of a hydropusher pressure him in the direction specified by an arrow
1. Hydropusher



"previous page
4.5. The roller with yokes - removal and installation
following page"
4.7. The soaking-up collector - removal and installation




9ac83ee2