Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Maintenance of the car
3. Четырехцилиндровыв engines
4. VS engines
5. All engines
5.1. General information
5.2. Check of a compression in engine cylinders
5.3. Dismantle of the power unit - a security measure
5.4. The engine - removal and installation
5.5. Capital repairs of the engine - general information
5.6. Restoration of the engine - an alternative
5.7. Capital repairs of the engine - a dismantling order
5.8. A head of the block of cylinders - dismantling.
5.9. Head of the block of cylinders cleanings and check of a state
5.10. A head of cylinders - assembly
5.11. Conrod and piston group dismantle
5.12. The crankshaft - dismantle
5.13. The block of cylinders - cleaning
5.14. The block of cylinders - check of a state
5.15. Rods and pistons - check of a state
5.16. The crankshaft - check of a state
5.17. Radical and conrod bearings - check and selection
5.18. Capital repairs of the engine - an assembly order
5.19. Piston rings - installation
5.20. The crankshaft - installation and check of gaps of radical bearings
5.21. A back epiploon - installation
5.22. Rods and pistons - installation and check of gaps in conrod bearings
5.23. Launch of the engine after repair and a running in
6. Cooling systems, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and elements of finishing
17. System of electric equipment
 





5-23-pusk-dvigatelya-posle-remonta-i-obkatka.html

5.23. Launch of the engine after repair and a running in

1. After the end of assembly check the level of oil and cooling liquid twice.
2. By the turned-out candlelight and the disconnected systems of ignition and the fuel pump turn the crankshaft to wash the cop of registration of pressure of oil with the sensor,
3. Screw candles, dress tips of high-voltage wires and connect system of ignition and the fuel pump.

22.6а Метка F на поршне 4-цилиндрового двигателя
22:6á F Tag on the piston of the 4-cylinder engine


22.6б Кернение на поршне двигателя V6
22:6í Kerneniye on the V6 engine piston


22.8 Введение поршня в цилиндр
22.8 Introduction of the piston to the cylinder


22.9а Отрезок калибра для измерения зазора в шатунном подшипнике
22:9á A caliber Piece for measurement of a gap in the conrod bearing


22.9б Определение зазора
22:9í Definition of a gap


4. Start the engine. The engine has to be started immediately, later the short period necessary for increase of pressure of fuel.
5. Warm up the engine, watching closely emergence of leaks of oil or cooling liquid.
6. Stop the engine and check levels of oil and cooling liquid.
7. Accelerate the car from the speed of 50 km/h to 90 km/h, release a pedal of a butterfly valve, having slowed down the car the engine to the speed of 50 km/h. Repeat the cycle of 10-12 times. At the same time occurs extra earnings of piston rings to walls of cylinders. Double-check levels of oil and liquid.
8. Make a trip on 800 km, without subjecting the engine to big loadings (move at a low speed), periodically checking oil level. In the period of a running in the raised oil consumption is possible.
9. After the run of 900-1100 km replace oil and an oil filter.
10. At a run of the subsequent several hundred kilometers conduct the car in the normal mode, avoiding too big and too small loadings.
11. Later 3300 km of a run replace again oil and an oil filter then the engine is considered passed a running in.

"previous page
5.22. Rods and pistons - installation and check of gaps in conrod bearings
following page"
6. Cooling systems, heating, ventilation and conditioning




9ac83ee2